HUAZHONG UNIVERSITY OF SCIENCE & TECHNOLOGY
中文
Home
Scientific Research
Research Field
Paper Publications
Patents
Published Books
Research Projects
Teaching Research
Teaching Resources
Teaching Information
Teaching Achievement
Awards and Honours
Enrollment Information
Student Information
My Album
Blog
Current position:
Professor Jinwen WANG at Hydropower School
>>
Scientific Research
>>
Paper Publications
WANG JIN WEN
Personal Information
Professor
Supervisor of Doctorate Candidates
Supervisor of Master's Candidates
Paper Publications
Cheng Chen, Chuanxiong Kang, Jinwen Wang(*).Jinwen Wang.Stochastic Linear Programming for Reservoir Operation with Constraints on Reliability and Vulnerability.[J].Water,2018,(2):175
Jinwen Wang, Wenbin Hu, Shuangquan Liu.Jinwen Wang.Short-Term Hydropower Scheduling Model with Two Coupled Temporal Scales.[J].Journal of Water Resources Planning and Management-ASCE,2018,(2):04017095
Chuanxiong Kang, Min Guo,Jinwen Wang (*).Jinwen Wang.Short-Term Hydrothermal Scheduling Using a Two-Stage Linear Programming with Special Ordered Sets Method.[J].Water Resources Management -Springer,2017,(1):3329–3341
Jinwen Wang, Shuangquan Liu, Yongchuan Zhang.Jinwen Wang.Quarter-hourly operation of large-scale hydropower reservoir systems with prioritized constraints.[J].Journal of Water Resources Planning and Management-ASCE,2015,(1):04014047
Jinwen Wang, Shuangquan Liu.Jinwen Wang.Quarter-hourly optimal operation of hydropower reservoirs with pumped storage plants.[J].Journal of Water Resources Planning and Management-ASCE,2012,(1):13-23
Jinwen Wang, Yongchuan Zhang.Jinwen Wang.Short-term operation of hydropower reservoirs with unit commitment and navigation.[J].Journal of Water Resources Planning and Management-ASCE,2012,(1):1-12
Jinwen Wang,Jinwen Wang.A new stochastic control approach to multireservoir operation problems with uncertain forecasts.[J].Water Resources Research, AGU,2010,(2):W02504
Jinwen Wang,Jinwen Wang.Short-term generation scheduling model of Fujian hydro system.[J].Energy Conversion and Management,2009,1085–1094
Jinwen Wang, Benjie Lu, Yongchuan Zhang.Jinwen Wang.Short-term generation scheduling for energy consumption minimization of large-scale hydro systems.[J].International Journal of Power & Energy Systems,2006,(1):18-25
Jinwen Wang, Xiaohui Yuan,Yongchuan Zhang.Jinwen Wang.Short-term scheduling of large-scale hydropower systems for energy maximization.[J].Journal of Water Resources Planning and Management, ASCE,2004,(3):198-205
Jinwen Wang, Xiaohui Yuan, Yongchuan Zhang,Youquan Zhang.Jinwen Wang.A reliability and risk analysis system for multipurpose reservoir operation.[J].Environmental Fluid Mechanics,2003,(4):289-303
Jinwen Wang,王金文 范习辉 张勇传 张世钦 乐玉华..王金文.Short-term generation scheduling for the peak-energy maximization of large-scale hydropower systems.[J].Automation of Electric Power Systems (In Chinese),2003,(15):29-34
total13 1/2
first
previous
next
last
Page